Schedule a Consultation

Work
With Us


Communicate with us regarding your project-- we have a skilled group of management that can help you with your requirements.




    The Consultation Process


    How it works

    First Steps

    For new wells there are several things to take into consideration:

    a.) Yield and pressure parameters for your project

    b.) Depth parameters and regional geology: We have an extensive in-house database of existing wells that can aid in determining a very accurate estimate of proposed well depths and yields.

    c.) Power requirements: We can help in determining the needed power sizing for your project and predict estimated costs of operation.

    d.) Permitting requirements: We work in a multitude of groundwater conservation districts and areas requiring permits for water wells. Our experience in these areas can help you untangle the requirements that may affect your water well.

    Acceptance

    a.) After discerning your water well needs we can coordinate a site visit, if needed, to aid in the placement of your well. Our goal is to fit the requirements you desire with an aesthetically pleasing outcome.

    b.) Upon acceptance of our estimates, we will prepare a contract and provide you with an estimate of the time frame to complete the project. At this time, we can aid you in obtaining the proper permits for construction.

    Installation

    a.) Our new water well projects normally consist of three phases:

    1.) mobilization of equipment and crews for the drilling of the pilot hole and analysis of the findings.

    2.) Construction of the permanent water well

    3.) Sizing and installation of the permanent pumping equipment and project finalization.

    Contact


    Monte Richardson
    1056 East First, Bellville, TX 77418
    Office: (979) 865-2393
    (800) 833-5538
    E-mail: monte@jswaterwells.com

    Shaun Grell--VP of Operations
    Mobile: (979) 270-1268
    E-Mail: shaun@jswaterwells.com

    Steven Robertson-Pump Service Superintendent
    Mobile: (979) 877-7076

    Diann Hill-Administration and Accounts Payable
    Office: (979) 865-2393
    (800) 833-5538
    Email: diann@jswaterwells.com

    Sheila Gardner-Permitting and Invoicing
    Office: (979) 865-2393
    (800) 833-5538
    Email: sheila@jswaterwells.com

    Rebecca Schulze-Irrigation Sales, Service and Repair Administration
    979-865-2393
    rebecca@jswaterwells.com

    Jason Acebo-Project Manager and Contracts Administrator
    979-865-2393
    800-833-5538
    jason@jswaterwells.com